A briefcase-sized in-situ resource utilisation rig that compacts and microwave-sinters lunar regolith simulant into structural bricks. Built so a university team can prototype off-world habitat construction on Earth today, and ship to LEO tomorrow.

Feasibility at a glance
PT localization
6/10
Partial
Most steps can be localised in Portugal.
Per unit
€8,000–€14,000 per unit
at 12-unit volume
Starter batch
12units
minimum viable run
To first batch
20weeks
6 phases, design to ship
Budget
€96K–€235K
all-in estimate
Bottom line
Picked based on the localization score (6/10) plus the dominant process (cnc machining). For an early build at this batch size, this gives you the best balance of cost, risk, and speed of iteration.
4 capabilities
Loads a measured dose of regolith into a tungsten-carbide cavity.
Compacts the dust into a brick-shaped puck under hydraulic pressure.
Sinters the puck with microwave energy until the silicates fuse.
Ejects the cooled brick onto a conveyor for the next layer of a wall.
4 stations · build route
Machine the cavity
5-axis CNC the Inconel cavity — it sees both pressure and 1100°C.
Build the chassis
Folded aluminum sheet, TIG-welded at the load-bearing corners only.
Wire the harness
Mil-spec connectors throughout; this thing is meant for spaceflight qual.
Validate with simulant
Run JSC-1A regolith for 72 hours and crush-test every tenth brick.
Machine the cavity
5-axis CNC the Inconel cavity — it sees both pressure and 1100°C.
Build the chassis
Folded aluminum sheet, TIG-welded at the load-bearing corners only.
Wire the harness
Mil-spec connectors throughout; this thing is meant for spaceflight qual.
Validate with simulant
Run JSC-1A regolith for 72 hours and crush-test every tenth brick.
3 identified · 1 blocking
High
Tooling amortisation locks the design
Cast / moulded parts demand tooling that is hard to revise once cut.
Mitigation — Run one full design review with a tooling shop before steel is touched.
Medium
Specialty material lead times slip
If the primary material (6061-T6 aluminum (frame)) source delays, the whole line idles.
Mitigation — Qualify a second-source supplier in week 1 and keep a 4-week safety stock.
Medium
Building / safety regulation drift
Construction-adjacent products attract new EU-level fire and load standards every 18 months.
Mitigation — Subscribe to the relevant EN/ISO bulletins and budget annual recertification.
20 weeks to first batch
CNC machining
wk 1–2Sheet-metal work
wk 3Welding
wk 4Anodising
wk 5Wire-harness build
wk 6Functional QA & batch sign-off
wk 7CNC machining
Sheet-metal work
wk 1–2 is the longest stretch — CNC machining takes 2 weeks of the 7 weeks on this build.
6 materials · 7 processes
Materials
Processes
587 Portuguese manufacturers matched
None cover the whole build — it splits across steps.
9 tasks · 30 weeks to first batch
Week 1
2 tasks
Lock the pilot scope to one variant
One material set, one feature set, one user persona. Anything else is roadmap, not pilot.
Shortlist three vendors per critical step
Use GETMILK Match to pull a ranked list across the top three processes — cnc_machining, sheet_metal, welding. Send the same RFQ to all three; do not customise per vendor yet.
Weeks 2–3
2 tasks
Freeze the design for the first 10 units
Move the active CAD set to a tagged release; any change after the freeze gets logged in the change-board.
Place first-article orders with two of the three vendors
waits on Vendor shortlist signed off
Order one of each critical part at full spec. Do not buy 100 — buy 1, inspect, learn, then buy 100.
Weeks 4–7
2 tasks
Run the integration pilot
waits on First articles delivered
Ten complete units assembled in-house. Track yield, defect modes, and cycle time on a shared dashboard.
Kick off compliance + certification
Engage a notified body for the relevant standards. Booking a slot now beats discovering a 12-week wait later.
Weeks 8–16
2 tasks
Put 25 units in the hands of lighthouse users
waits on Integration pilot complete
These users help refine the product, but they also become your first paid customers. Charge a symbolic price so the data is real.
Scale-readiness review with the chosen primary vendor
waits on Lighthouse trial telemetry
Before you tool up for 1000 units, walk the line together and agree on capacity, payment terms, and the failure-mode plan.
Ongoing
1 task
Stand up a customer support loop
Every defect that reaches a user becomes a ticket, a root cause, a fix, and a regression test on the line.
3 roles to fill before month one
EU funding officer
EU Built4People
Match-fund up to 50% of the first pilot line.
Academic partner
Materials Lab @ U.Porto
Free third-party validation for novel composites.
Compliance lawyer
Lisbon CMVM compliance counsel
Owns the CE / fire regs path for buildings.
3 things to avoid in this plan
watch-out
Founder time leaks into vendor management instead of customer development
certification
Compliance booked too late and blocks shipping for 8+ weeks
quality
Demand exceeds the chosen vendor's small-batch capacity right when momentum matters
2 tasks in week 1
Lock the pilot scope to one variant
Welding
Anodising
Wire-harness build
Functional QA & batch sign-off
587 matched · 8 shown, ranked by coverage
Covers, left to right: CNC Machining · Sheet Metal · Welding · Anodizing · Wire Harness · Final Assembly · Testing & Inspection
Manufacturer
Location
Covers
Certifications
People
Portuguese producers per required step
Final Assembly
369
CNC Machining
212
Testing & Inspection
178
Welding
92
Sheet Metal
21
Wire Harness
5
Anodizing
3
How many cover more than one step
The gap
Picked based on the localization score (6/10) plus the dominant process (cnc machining). For an early build at this batch size, this gives you the best balance of cost, risk, and speed of iteration.
Send one RFQ to the top 4
SMF, CEFAMOL, Aernnova Aerospace, Lacovale — same package, one click.