A briefcase-sized in-situ resource utilisation rig that compacts and microwave-sinters lunar regolith simulant into structural bricks. Built so a university team can prototype off-world habitat construction on Earth today, and ship to LEO tomorrow.

Feasibility at a glance
PT localization
6/10
Partial
Most steps can be localised in Portugal.
Per unit
€8,000–€14,000 per unit
at 12-unit volume
Starter batch
12units
minimum viable run
To first batch
20weeks
6 phases, design to ship
Budget
€96K–€235K
all-in estimate
Bottom line
Picked based on the localization score (6/10) plus the dominant process (cnc machining). For an early build at this batch size, this gives you the best balance of cost, risk, and speed of iteration.
4 capabilities
Loads a measured dose of regolith into a tungsten-carbide cavity.
Compacts the dust into a brick-shaped puck under hydraulic pressure.
Sinters the puck with microwave energy until the silicates fuse.
Ejects the cooled brick onto a conveyor for the next layer of a wall.
4 stations · build route
Machine the cavity
5-axis CNC the Inconel cavity — it sees both pressure and 1100°C.
Build the chassis
Folded aluminum sheet, TIG-welded at the load-bearing corners only.
Wire the harness
Mil-spec connectors throughout; this thing is meant for spaceflight qual.
Validate with simulant
Run JSC-1A regolith for 72 hours and crush-test every tenth brick.
Machine the cavity
5-axis CNC the Inconel cavity — it sees both pressure and 1100°C.
Build the chassis
Folded aluminum sheet, TIG-welded at the load-bearing corners only.
Wire the harness
Mil-spec connectors throughout; this thing is meant for spaceflight qual.
Validate with simulant
Run JSC-1A regolith for 72 hours and crush-test every tenth brick.
3 identified · 1 blocking
High
Tooling amortisation locks the design
Cast / moulded parts demand tooling that is hard to revise once cut.
Mitigation — Run one full design review with a tooling shop before steel is touched.
Medium
Specialty material lead times slip
If the primary material (6061-T6 aluminum (frame)) source delays, the whole line idles.
Mitigation — Qualify a second-source supplier in week 1 and keep a 4-week safety stock.
Medium
Building / safety regulation drift
Construction-adjacent products attract new EU-level fire and load standards every 18 months.
Mitigation — Subscribe to the relevant EN/ISO bulletins and budget annual recertification.
20 weeks to first batch
CNC machining
wk 1–2Sheet-metal work
wk 3Welding
wk 4Anodising
wk 5Wire-harness build
wk 6Functional QA & batch sign-off
wk 7CNC machining
Sheet-metal work
Welding
Anodising
Wire-harness build
Functional QA & batch sign-off
wk 1–2 is the longest stretch — CNC machining takes 2 weeks of the 7 weeks on this build.
6 materials · 7 processes
Materials
Processes
5 principles
A regolith brick press compacts fine abrasive dust and sinters it with microwave heat. The hard parts are abrasion, heat management and testing on Earth with simulant that behaves differently from real lunar soil.
1
Design every sliding surface against abrasion
Regolith particles are sharp and fine. Use hard faces such as tungsten carbide on the ram and die, and keep seals away from the dust path.
2
Separate the hot zone from the structure
Inconel and insulation contain the microwave cavity, while the aluminium frame stays cool. Thermal breaks stop the frame from distorting.
3
Control microwave heating evenly
Regolith absorbs microwaves unevenly, which causes hot spots and cracked bricks. Cavity shape, mode stirring and temperature sensing matter more than raw power.
4
Build to space test standards from the start
Vibration, thermal vacuum and outgassing tests (for example ECSS standards) decide material and fastener choices.
5
Measure brick quality, not just press force
Density and compressive strength of each batch are the real output. Plan sample testing into the design.
Common pitfalls
Avoid
Using standard hydraulic seals that fail quickly in fine abrasive dust.
Avoid
Assuming simulant results transfer directly to real regolith, which varies by site.
Avoid
Ignoring microwave leakage and its effect on nearby electronics.
Avoid
Anodising parts that later see high heat, where the coating can craze.
4 phases
Using local materials on the Moon is an active research area. The points below are trends in the field.
2026–2028
Ground demonstrators
Trend: lab presses using simulants such as JSC-1A and LHS-1 prove sintering recipes.
2028–2031
Vacuum and thermal testing
Trend: prototypes move into thermal vacuum chambers to check behaviour without air.
2031–2034
Small flight experiments
Trend: compact payloads test sintering on lander missions.
2034–2036
Earth spin-offs
Trend: the same methods are studied for low-energy building materials from local soils on Earth.
Outlook
Expect this to stay a research and demonstration product, with value in testing methods and Earth applications.
7 materials
Aluminium alloy
Low supply risk
6061-T6 frame and brackets
Sourced from: Primary aluminium is led by China, with smelters in Norway, the EU and the Middle East; bar and plate are widely stocked in Europe.
Inconel 718
Medium supply risk
Microwave cavity and hot-zone parts
Sourced from: Nickel comes mainly from Indonesia, the Philippines and Russia; superalloy bar is made by a few mills in the US and Europe.
Hard to machine; plan for slow cutting and tool wear.
Tungsten carbide
High supply risk
Ram face and die liners
Sourced from: China dominates tungsten mining and processing.
Borosilicate glass
Low supply risk
Viewing window
Sourced from: Produced by several glassmakers in Europe, the US and Asia.
Mineral wool
Low supply risk
Thermal insulation around the cavity
Sourced from: Made from basalt or slag in many EU countries.
JSC-1A regolith simulant
Medium supply risk
Test feed
Sourced from: Made in small batches by specialist suppliers, mainly in the US.
Different simulants give different results; record which one was used.
Copper
Medium supply risk
Wiring and microwave waveguide parts
Sourced from: Mined mainly in Chile, Peru and DR Congo; Portugal mines copper at Neves-Corvo.
5 companies from the atlas
Vila Nova de Famalicão
Laser cutting, sheet metal and welding
Frame panels and cavity enclosure sheet parts.
Marinha Grande
CNC machining and sheet metal
Ram guides and machined frame blocks.
Celorico de Basto
CNC machining and anodising
Anodised 6061 frame brackets.
Oeiras
CNC machining, sheet metal and anodising
Small machined fixtures and anodised covers.
S. Pedro da Cova
Machining, sheet metal and wire harness
Harness and cabinet for the control electronics.
587 Portuguese manufacturers matched
None cover the whole build — it splits across steps.
587 matched · 8 shown, ranked by coverage
Services each manufacturer can handle for this build.
Manufacturer
Location
Covers
Certifications
People
Portuguese producers per required step
Final Assembly
369
CNC Machining
212
Testing & Inspection
178
Welding
92
Sheet Metal
21
Wire Harness
5
Anodizing
3
How many cover more than one step
The gap
Picked based on the localization score (6/10) plus the dominant process (cnc machining). For an early build at this batch size, this gives you the best balance of cost, risk, and speed of iteration.
Send one RFQ to the top 4
SMF, CEFAMOL, Aernnova Aerospace, Lacovale — same package, one click.
9 tasks · 30 weeks to first batch
Week 1
2 tasks
Lock the pilot scope to one variant
One material set, one feature set, one user persona. Anything else is roadmap, not pilot.
Shortlist three vendors per critical step
Use GETMILK Match to pull a ranked list across the top three processes — cnc_machining, sheet_metal, welding. Send the same RFQ to all three; do not customise per vendor yet.
Weeks 2–3
2 tasks
Freeze the design for the first 10 units
Move the active CAD set to a tagged release; any change after the freeze gets logged in the change-board.
Place first-article orders with two of the three vendors
waits on Vendor shortlist signed off
Order one of each critical part at full spec. Do not buy 100 — buy 1, inspect, learn, then buy 100.
Weeks 4–7
2 tasks
Run the integration pilot
waits on First articles delivered
Ten complete units assembled in-house. Track yield, defect modes, and cycle time on a shared dashboard.
Kick off compliance + certification
Engage a notified body for the relevant standards. Booking a slot now beats discovering a 12-week wait later.
Weeks 8–16
2 tasks
Put 25 units in the hands of lighthouse users
waits on Integration pilot complete
These users help refine the product, but they also become your first paid customers. Charge a symbolic price so the data is real.
Scale-readiness review with the chosen primary vendor
waits on Lighthouse trial telemetry
Before you tool up for 1000 units, walk the line together and agree on capacity, payment terms, and the failure-mode plan.
Ongoing
1 task
Stand up a customer support loop
Every defect that reaches a user becomes a ticket, a root cause, a fix, and a regression test on the line.
3 roles to fill before month one
EU funding officer
EU Built4People
Match-fund up to 50% of the first pilot line.
Academic partner
Materials Lab @ U.Porto
Free third-party validation for novel composites.
Compliance lawyer
Lisbon CMVM compliance counsel
Owns the CE / fire regs path for buildings.
3 things to avoid in this plan
cost
Founder time leaks into vendor management instead of customer development
certification
Compliance booked too late and blocks shipping for 8+ weeks
quality
Demand exceeds the chosen vendor's small-batch capacity right when momentum matters
2 tasks in week 1
Lock the pilot scope to one variant