getmil.com
Drone PartsBattery Pack (LiPo)
Battery Pack (LiPo)

Battery Pack (LiPo)

Power Systemsmedium

High-discharge lithium polymer cells configured as 4S–6S packs (14.8–22.2V). Must deliver 100A+ burst current for aggressive flight. The heaviest single component on most drones.

What this part does

4 functions
  • Stores the energy for the entire flight.
  • Delivers short bursts of 100A+ during aggressive throttle.
  • Heaviest single component β€” defines total flight time and weight.
  • Recharges in ~20 minutes through a balance charger.

How to make it

5 steps
  1. 1Sort
    Match cells by capacity
  2. 2Weld
    Spot-weld nickel tabs
  3. 3Wire up
    XT60 + balance lead
  4. 4Cycle test
    Charge/discharge QC
  5. 5Sleeve
    Heat-shrink + label

Each step happens at a real manufacturer β€” scroll down to see who can do it and where.

EU Localization
8/10
Est. Cost
$20–$60 per pack
Starter Batch
500 units
Tolerance
Standard (Β±0.1–1mm)
Manufacturers Found
8

Manufacturing Processes

Materials

Lithium NMCLithium LiFePO4CopperSilicone Rubber

Key Requirements

  • β€’Cell matching & sorting capability
  • β€’Spot welding or tab welding
  • β€’Balance lead assembly
  • β€’Charge/discharge cycle testing
  • β€’UN38.3 certification for shipping

Bill of Materials

  1. 1.Li-Po cells (4S/6S configuration)
  2. 2.Nickel tabs or wire bonds
  3. 3.XT60 / XT90 connector
  4. 4.Balance lead (JST-XH)
  5. 5.Heat-shrink sleeve
  6. 6.Capacity/C-rate label

Matched Manufacturers

8 of 8 Β· sorted by score
70score

Inferred from Wayback enrichment of company website

Wire Harness
Vila Nova de Gaia, PortugalMedium (50-249)
70score

Inferred from Wayback enrichment of company website

Wire Harness
Vila Nova de Paiva, PortugalSmall (10-49)
70score

Inferred from Wayback enrichment of company website

Wire Harness
Alverca, PortugalLarge (250-999)
70score

Inferred from Wayback enrichment of company website

Wire Harness
S. Pedro da Cova, PortugalMedium (50-249)
70score

Inferred from Wayback enrichment of company website

Wire Harness
Ovar, PortugalLarge (250-999)
70score

Inferred from Wayback enrichment of company website

Testing & Inspection
Aveiro, PortugalMedium (50-249)
70score

Inferred from Wayback enrichment of company website

Testing & Inspection
Ovar, PortugalLarge (250-999)
70score

Inferred from Wayback enrichment of company website

Testing & Inspection
Braga, PortugalSmall (10-49)

Supply Chain Decision Guide

Compare sourcing strategies, understand risks, and see the path to production.

Key Insight

The €2B CALB Sines gigafactory (operational 2027-2028) will make Portugal an EU battery hub. Start pack assembly now with imported cells; vertically integrate cell supply later.

Sourcing Options

Recommended
Produce in PortugalProduce in Portugal β€” Pack Assembly at MeterBoost

Import premium cells (Molicel P42A, Samsung 50S) from authorized distributors. Assemble packs at MeterBoost Portugal β€” spot welding, balance leads, QC testing.

Cost
€25–€50
Lead Time
3w
Confidence
8/10
Pros
  • Fast turnaround β€” 1-2 weeks assembly
  • Custom configurations (4S/6S, any capacity, any connector)
  • Cell matching for consistent performance
  • EU Battery Regulation compliant from day one
  • CALB Sines integration path (2027-2028) for full localization
Cons
  • Cells still imported (Molicel Canada/Japan, Samsung Korea)
  • Higher cost than Chinese packs at small volume
  • UN38.3 certification needed (€3-8K per design, one-time)
MeterBoost (PT)Custom battery assemblers PT
White-label EUWhite-label EU β€” European Battery Brands

Source finished packs from EU battery companies β€” Gens Ace Europe, ISDT EU, or specialist EU LiPo assemblers. Rebrand with your specs.

Cost
€35–€60
Lead Time
2w
Confidence
7/10
Pros
  • No assembly infrastructure needed
  • Pre-tested, pre-certified packs
  • EU warehouse β€” 1-2 week delivery
  • CE + UN38.3 already handled by manufacturer
Cons
  • Limited to their standard configurations
  • Higher per-unit cost (€35-60)
  • Less control over cell selection and matching
  • Dependent on their stock availability
Gens Ace EUISDT EuropeBonka EU distribution
EU Co-DevelopmentEU Co-Development β€” CALB Sines Integration (2027+)

When CALB's 15 GWh gigafactory in Sines opens (2027-2028), partner directly for cell supply. LFP cells manufactured in Portugal β€” fully local supply chain.

Cost
€15–€35 (projected)
Lead Time
2w
Confidence
5/10
Pros
  • Fully local supply chain β€” cells + assembly in Portugal
  • Massive capacity (15 GWh β€” no supply constraints)
  • LFP chemistry β€” safer, 3000+ cycle life
  • Strongest "Made in EU" story possible
Cons
  • Not available until 2027-2028
  • LFP has lower energy density than LiPo (15-20% heavier packs)
  • CALB may prioritize EV contracts over small drone orders
  • Unproven for high-C-rate FPV drone applications
CALB Sines (2027)MeterBoost (assembly)
Comparison Only
China (Baseline)Import from China β€” Complete Packs
Not recommended β€” shown as price/speed baseline

Buy finished LiPo packs from CNHL, Tattu (Gens Ace China), or GNB. Cheapest but maximum dependency.

Cost
€15–€30
Lead Time
6w
Confidence
7/10
Pros
  • Cheapest per-unit cost (€15-30)
  • Proven high-C-rate performance for FPV
  • Ready to use β€” no assembly needed
Cons
  • Dangerous Goods shipping β€” expensive air freight (€5-15/kg extra)
  • EU Battery Regulation compliance burden falls on importer (YOU)
  • Quality variance β€” cells may be B-grade without disclosure
  • No customization β€” take what they offer
  • Full China supply chain dependency
CNHLTattu / Gens Ace (CN)GNB
Recommended: Pack assembly is straightforward. MeterBoost does it now. Import cells from Molicel/Samsung, assemble locally. CALB Sines (2027) will add cell supply.

Supply Chain Risks

highUN38.3 certification

Required for shipping lithium batteries. Testing costs €3-8K per design. Takes 4-6 weeks.

Mitigation: Budget for UN38.3 testing upfront. Use an EU test lab (TÜV, SGS Portugal). One test covers all packs of same cell/config.
highEU Battery Regulation 2023/1542

From August 2025: CE marking, carbon footprint labeling (A-G grades 2026), collection/recycling obligations.

Mitigation: Partner with a compliance consultancy. Use EU-sourced cells when available to simplify carbon footprint.
mediumCell quality & counterfeits

Counterfeit cells (fake Molicel, Samsung) are common. One bad cell can cause fire.

Mitigation: Source ONLY from authorized distributors (Mouser, TME, direct from Molicel). Verify IR and capacity on every cell.

Path to Production β€” 6 weeks total

1
Cell Selection & Testing~2w

Choose cell (Molicel P42A or Samsung 50S). Order samples. Test C-rate, IR, capacity matching.

Battery spec defined (voltage, capacity, C-rate)
2
Pack Design~1w

Design pack layout β€” cell configuration, tab routing, balance leads, connector placement.

Cell selectedFrame battery bay dimensions
3
Prototype Assembly~1w

Build 10 prototype packs. Spot weld tabs, assemble balance leads, heat-shrink.

Cells receivedPack design approved
4
Validation & UN38.3~5w

Flight test with prototypes. Submit for UN38.3 testing if shipping commercially.

Prototype packs assembled
5
Production~2w

500-unit batch. Cell matching, assembly, QC, labeling.

UN38.3 passedCell stock secured

Open Source Resources

Regulatory & Compliance

  • β–ΈEU Battery Regulation 2023/1542 β€” CE marking, carbon footprint label
  • β–ΈUN38.3 testing for air/sea transport
  • β–ΈIEC 62133 safety standard
  • β–ΈWEEE producer registration
  • β–ΈDG shipping certification for logistics partner

Deep Intelligence

Design best practices, technology evolution forecasts, materials supply chain analysis, and prototyping partners.